User`s guide
Link Model Objects
2-19
5
Right-click the slvnvdemo_powerwindow_controller/control subsystem and
select Requirements Traceability. The new RMI link appears at the top of the
Requirements Traceability submenu.
6
To verify that the links were created, in the
slvnvdemo_powerwindow_controller model window, select Analysis >
Requirements Traceability > Highlight Model.
The blocks with requirements links are highlighted.
7
Close the slvnvdemo_powerwindow_controller and slvnvdemo_powerwindow
models.