User`s guide

Real-Time Workshop Workflow
2-5
What is the highest priority for your application — traceability, efficiency,
extra safety precaution, or some other criteria?
What is the second highest priority?
Can the priority at the start of the project differ from the priority required
for the end result? What tradeoffs can be made?
Once you have answered these questions, review the following table, which
summarizes the impact of each configuration option on debugging,
traceability, efficiency, and safety considerations, and indicates the default
(“factory”) configuration settings for the Generic Real-Time (GRT) target. For
additional details, click the links in the Configuration Parameters column.
Note If you use a Real-Time Workshop Embedded Coder target, a specific
embedded target, a Stateflow target, or fixed point blocks, you need to
consider the mapping of many other configuration parameters. For details,
see the Real-Time Workshop Embedded Coder documentation and any other
documentation specific to your target environment.
Mapping of Application Requirements to Configuration Parameters
Configuration
Parameter
Debugging Traceability Efficiency Safety
Precaution
Factory
Default
Solver
Stop time
No impact No impact No impact No impact 10.
Type
No impact No impact No impact No impact Variable
-step
Data Import/Export
Load from workspace
N/A N/A N/A N/A Clear
Save to workspace
Maybe Maybe Clear No impact Set
Save options
Maybe Maybe No impact No impact Set