Operating instructions

Holding Band
Re-assembly
Ausgabe
issue
A / 23.02.1995
Dokument
document
OM.HBD.01e
Blatt
sheet
1 (2)
Holding Band (HBD) - Assembly
Tools required for the re-assembly, see document
OM.SPT.01.
Prepare holding band
Only prefabricated double-band holding bands
should be used. The diameter () and in particular
the breadth (b) of the holding band is matched to the
universal joint sleeve.
Test holding band
The bent holding band (HBD) must fit against the
holding band loop (SCL), if necessary apply
pressure with the tool/pliers (WZ).
Assembly of holding band
Insert holding band in tool (W3/ see Point 9). Hold
free end of holding band with control lever (EX),
turn crank (KU) until the holding band is strained
and fitting against the holding band loop (SCL).
Carefully contract holding band until it fits inside the
circular groove of the universal joint sleeve.
Correct holding band tension (HBD)
Correct
Holding band
(HBD) has
slightly con-
tracted outer
form of
univers-al joint
sleeve and is
stuck in
position.
Incorrect
Holding band
(HBD) is too
slack and
liable to slip.
Incorrect
Holding band
(HBD) is too tight.
Universal joint
sleeve will be
damaged/sheared
off.
Folding back the holding band (HBD)
Slowly swivel mounting tool upward by 60°, at the
same time slackening the crank (KU) by
approximately one half revolution. Swivel cutting
lever (SH) forward until the pressure plate fits
against the holding band loop (SCL).
22