Installation Instructions
COLONIAL ELEGANCE INC.
3800, Du Tricentenaire
Montreal, Quebec, Canada H1B 5T8
TEL 514-640-1212 • 800-361-2030
FAX 888-640-1744
info@colonialelegance.com
www.colonialelegance.com
INSTALLATION INSTRUCTIONS FOR VERONA GLASS PANEL STAIRWAY
INSTRUCTION D’INSTALLATION RAMPE D’ESCALIER EN VERRE VERONA
FOR INSTALLATION IN THE STAIRWAY AND STRAIGHT OR MEZZANINE AREAS
POUR INSTALLATION DANS L’ESCALIER ET LA SECTION PALIER OU MEZZANINE
3
2
Step 2: Insert the two sili-
cone pads at the bottom of
the thin bracket near the
screws. Apply a generous
coat of clear silicone into the
thin bracket and the large
bracket under the handrail.
/ Étape 2: Insérez les deux
pastilles en silicone au fond
du support mince près des
vis. Appliquez généreuse-
ment du silicone clair au
fond du support de plancher
et au fond du support de
main courante.
Step 3: Slide the glass panel gently up into the handrail bracket and then slide the panel down inserting it into the floor
bracket. Secure the glass panel with masking tape for 24 hours (see instructions of the silicone manufacturer). / Étape 3:
Glissez le panneau de verre délicatement vers le haut dans le support main courante puis faites glisser le panneau vers
le bas en l’insérant dans le support plancher. Sécurisez le panneau de verre avec du ruban à masquer durant 24 heures
(voir instruction du fabricant du silicone).
STRAIGHT OR MEZZANINE AREAS / SECTION PALIER OU MEZZANINE
STAIRWAY / SECTION ESCALIER