Installation Instructions
a
)
Remove the adhesive backing from the dust plug pad. Be
careful not to contact the adhesive with any other objects.
b
)
Place the dust plug pad at the top of the stationary door panel
prior to attaching the screen track
(
fig.1
).
c
) The top of the pad should butt up against the bottom of
the frame leg (A) and be flush with the face of the stationary
door edge
.
Note:
If the pad is positioned too low, it will impede the
smooth of the screen. The dust plug will be hidden behind
the screen.
a
)
Insert the hinge screen track into the
header screen channel. Tip the track as shown.
Be certain the long flat part of the track is
facing away from the door unit
(
fig.2
)
.
b
)
Push the track upward maintaining the angle
until the inside leg of the track is positioned at
the top-back of the screen channel as shown
(
fig.3 & 3a
).
c
) Pull the bottom of the track away
from the door unit to snap it into place
(
fig.4 & 4a
)
.
Doc #QMP-WI-040 Rev. A Date: 4/13 Owner: Quality Manager
SLIDING PATIO DOOR
SCREEN DOOR
INSTALLATION INSTRUCTIONS
REQUIRED TOOLS
Safety Glasses • Marker •
Flat Screw Driver
Drill • 7/64" Drill Bit
NOTE:
These instructions are recommended installation methods and not a substitute for local building codes.
Please consult your local building codes prior to any door installation.
1
)
Apply the Dust Plug Pad 2
)
Insert the Hanging Screen Track
g. 1
g. 3
g. 3a
g. 2
g. 4a
g. 4
Door Plug Pad
Frame Leg
Door Edge