Installation Instructions
a
)
 Set the bottom of the door unit into the rough 
opening and tip the top of the unit into place 
(
fig.12
)
. Looking at the top hinge, center the 
middle notch on the door hanger directly in line 
with the plumb line drawn in Step 7 
(
fig.13
)
. 
Once the notch and the plumb line are in 
alignment, run one of the supplied 1-5/8" screws 
through the long slot in the hanger and into the 
stud wall 
(
fig.14
)
.
b
)
 Repeat this process for the next two hinge 
locations making sure to align the same notch 
from the remaining two clips with the plumb line. 
Run one screw into each of the hangers.
8
)
 Set Door Into Rough Opening and Secure Hinge Side
9
)
Securing Strike Side
11
)
Secure Exterior Side Hangers
12
)
Install Shims
13
)
Secure and Finish Shims
10
)
Remove Clip
g. 13 g. 14
g. 15
g. 20
g. 23
g. 24
g. 25
g. 16
g. 21 g. 22
g. 17
g. 18 g. 19
g. 12
a
)
 Starting with the top door hanger on 
the strike side, check the margin between 
the door and the strike jamb. The margin 
should equal 1/8" 
(
fig.15
)
. Adjust the 
jamb accordingly and then run one 
1-5/8" screw through the center of 
the door hanger slot. 
(
fig.16
)
.
b
)
 Repeat this process for the remaining 
two door hangers on the strike side.
a
)
 Next, using a hammer, tap the six door 
hangers on the exterior side of the door back 
to their original position so that they are tight 
against the wall surface 
(
fig.20 & 21
)
.
b
)
 Run one 1-5/8" screw into each of the six 
door hanger locations 
(
fig.22
)
.
a
)
 Place shims directly behind each of 
the three hinge locations. Keep the shims 
as flat as possible during the installation 
in order to prevent twist on the jambs 
(
fig.23
)
.
Note: Door units are heavy. If this 
step is not performed the door slab 
may sag in the opening over time.
Position shims to keep them as flat 
as possible
a
)
 Remove one hinge 
screw from each of the 
hinges on the hinge jamb. 
Replace the screws using 
one 2-½" construction 
screw for each hinge. The 
screw should pass through 
the hinge shims and into 
the rough opening stud. 
(
fig.24
)
.
b
) 
Use a hammer to 
remove all excess shim 
material 
(
fig.25
)
.
a
)
 Remove the door clip 
(
fig.17 & 18
)
 and re-check the 
door for square. The margin should 
equal 1/8" across the top of the 
door and down the strike jamb. Make 
adjustments as necessary. 
(
fig.19
)
.
1/8"