User Manual

1
OPERATING INSTRUCTIONS
PUSH CONNECT, GM FUEL LINE FLARING,
45˚ DOUBLE FLARING, METRIC BUBBLE FLARING,
GM TRANSMISSION COOLING LINE*
WARNING! Wear safety goggles when using this tool.
PRE-OPERATION SET-UP
• Open the relief valve to fully recess the piston, then close tightly.
• Rotate the yoke fully counter-clockwise to bottom out the adapter seat.
PUSH CONNECT, GM FUEL LINE FLARING,
GM TRANSMISSION COOLING LINE INSTRUCTIONS
1) Rotate the yoke fully counter-clockwise.
Place the adapter onto the adapter seat on
the end of the piston.
2) Insert the tube between the dies so it is
even with the edge as shown.
3) Insert dies and tubing into the yoke using
the stabilizing lever. Make sure die and
tube are level prior to tightening.
(important to securely fasten
before moving on to step #4)
4) Grasp the yoke and rotate the hydraulic
cylinder clockwise until it stops.
(The adapter should engage the die.)
WARNING
Wear Safety Goggles
Avoid Contact with Refrigerant

Summary of content (4 pages)