SSBK-PNB Boom Assembly Card
HAVING TROUBLE? CALL SUPPORT AT: 320.340.6464
SSBK-PNB BOOM ASSEMBLY
PNB-AC
Boom Assembly (1)
34-140165
INCLUDED
COMPONENTS
TOOLS REQUIRED
PRAYING
IMPLE
S
MOBILE SPRAY ASSISTANT
INTEGRATE YOUR SPRAY EQUIPMENT AND ACREAGE. CALCULATE YOUR NEEDED LIQUID AND APPLICATION SPEED.
Fan Nozzle (3)
G-8259494
Fan Nozzle Cap (3)
G-T00100001
Nozzle Elbow (2)
G-8230022
Boomless Nozzle Cap (2)
G-8253047
Boomless Nozzle (2)
BN2BP088RSX and
BN2BP088LSX
Gasket (8)
G-G00002020
Nozzle Strainer (5)
NS-50
Flush Port Cap (1)
G-T00100036
Mounting U-Bolts (2)
33-103279
TOOLS
PARTS
Place Gasket inside Flush Port Cap.
Push onto end of Boom Assembly and twist to lock.
1.
Caps the Flush Port
None
TOOLS
PARTS
2.
None
Installs Nozzle Elbows
Insert Gasket into the Nozzle Elbow.
Push Nozzle Elbow onto one of the open Nozzle Assembly Ports
and twist to lock.
NOTE: This step is repeated
for each end of the Boom
Assembly.
NOTE:
IF YOU PURCHASED A COMPLETED BROADCAST SPRAYER,
FOLLOW THE SPOT SPRAYER MANUAL AND MOUNT KIT
ASSEMBLY INSTRUCTIONS BEFORE YOU COMPLETE BOOM
ASSEMBLY STEPS.
1/2” SOCKET WRENCH
FREE
Boom Upright Brackets (2)
31-100160
Mounting Plates (2)
31-100322
1” Bolts (6)
33-100116
Flange Nuts (6)
33-100113




