Instructions / Assembly

Safety Considerations and Warnings
1. Use appropriate safety glasses, gloves, hard hats,
restraints, and other equipment to avoid injury.
2. Wear durable work gloves while handling the unit
during installation. This product has sharp edges that can
cause injury.
3. Observe all applicable building codes in your area.
4. Do not damage electrical wiring or other hidden utilities
when cutting or drilling.
5. Before servicing the unit, disconnect power leads from
solar panel to prevent accidental operation.
6. Make sure blade is on tight and ensure the set screw is
securely tightened.
7. Use this unit only in the manner intended by GAF. If you
have any questions, please contact Master Flow
®
Technical
Service at 1-800-211-9612.
8. Ducted fans must always be vented to the outdoors.
CAUTION: FOR GENERAL VENTILATING USE ONLY.
THIS FAN HAS AN UNGUARDED IMPELLER. DO
NOT USE IN LOCATIONS READILY ACCESSIBLE TO
PEOPLE OR ANIMALS. DO NOT USE TO EXHAUST
HAZARDOUS OR EXPLOSIVE MATERIALS OR VAPORS.
Important: Your solar panel configuration may differ
from the one shown in the illustrations. The perfor-
mance of all configurations is the same.
Tools Required
s$RILLsvCM$RILL"ITs%XTENSION#ORDs5TILITY+NIFE
s0OWER3ABEROR*IG3AWANDOR(AND3AWs3AFETY%YEWEAR
s'ALVANIZED2OOFING.AILSs#AULKING'UNs'LOVESs,ADDER
s#LAW(AMMERs3CREWDRIVERs0ENCILOR-ARKERs3ILICONE
s0LIERSs2OOFING#EMENTs.UT$RIVER
1. Determine Location
Place vent as close to the peak of the roof as possible but
below the ridge line. Be sure the unit faces to the south for
optimal power. Make sure the location is not be shaded by
trees or other nearby structures during the day (Figure 1a).
Measure from the peak of the roof to the midpoint of the
solar power vent (Figure 1b). Transfer this measurement
into the attic and mark the location inside the attic, centered
between two rafters, and drill a hole (Figure 1c). Put an
object, such a pencil or nail, through the hole to mark it on
the outside. Note: Single units should be centered. If multiple
units are used, space evenly over the length of the ridge.
2. Mark Opening
#UTOUTTHEvCMTEMPLATELOCATEDONTHE&RENCH
language panel of the solar power vent carton. Place center
of template over hole marked in roof, in step one. Use
CORRECTLYPOSITIONEDTEMPLATETOMARKACIRCLE&ORRAFTERSv
(61cm) on center, mark the cut out as shown in (Figure
2a)&ORRAFTERSvCMONCENTERPROCEEDWITH
marking as shown (Figure 2b).
3. Cut Out Opening And Test Position
2OLLBACKANDSEPARATEALLSHINGLESvCMFROMTHE
top and sides of the cut–out area. Be sure that all roofing
nails have been removed. Using a saber saw, jig saw or
hand saw, cut and remove all roof shingles and deck inside
THEvCMDIAMETERCIRCLE(Figure 3a). Do not cut
any rafters. Test the final position by inserting the top half
of the unit flashing under the rolled shingles. Trim shingles
as necessary (Figure 3b).
4. Secure And Seal Unit
Remove the unit from the test position and liberally apply
roof cement to the bottom side of the flashing. Align the
unit and slide it under the shingle corners. Be sure that the
arrow marked in the flashing points up to the roof peak.
Secure the unit into place with galvanized roofing nails at
ALLFOURCORNERSANDAPPROXIMATELYEVERYvCMALONG
the sides of the flashing (Figure 4). Finish by using roof
cement to seal all flashing and shingle edges, as well as
nail heads and stack vertical seam. Press all raised shingle
edges back into position. Warning: Using excess roof cement
may cause blistering in the roofing shingles.
5. Mount Solar Panel (Use only if mounting Solar panel
on roof deck) Remove the included solar panel mounting kit
FROMTHECARTON4HEKITCONTAINSDECKSCREWS
BOLTSNYLOCKNUTSANDh,vSHAPEDWINGS
A. Mark ‘L’-shaped brackets & top rail mounting holes...
0LACETHESOLARPANELATLEASTvCMABOVESHINGLE
OVERLAPS!TTACHTHEh,vSHAPEDWINGSMAKINGSURETHAT
each bolt is in the center of the slot in the rail (Figure 5a).
Use a grease pencil or chalk to trace the outline of the
h,vSHAPEDWINGSONTHESHINGLESANDALSOTOMARKBOTH
top rail mounting holes.
Note: To avoid possible weather infiltration, do not place
THEh,vSHAPEDWINGSORTHETOPRAILSONTHEVERTICALSPACES
between the shingles tabs.
B. Attach “L”-shaped brackets to roof... Once you have
MARKEDTHEh,vSHAPEDWINGSANDTOPRAILMOUNTINGHOLES
REMOVETHEh,vSHAPEDWINGSFROMTHESOLARPANELFRAME
and lay the panel aside. At the locations previously traced,
CAREFULLYPRYTHESHINGLESANDSLIDEEACHh,vSHAPEDWING
under the shingles. Align both wings with the visible por-
tion of your traced outline. While lifting the shingles, attach
BOTHh,vWINGSTOTHEROOFDECKWITHAPROVIDEDDECKSCREW
(Figure 5b). Press the shingle back down into place. Apply
roofing cement under the shingles to seal them to the roof.
C. Attach top rail bracket... Carefully lift up the shingles
where the top rail mounting holes were previously marked.
Now, align the panel frame between the installed
h,vSHAPEDWINGS#ENTERTHESLOTSINTHERAILSWITHTHE
mounting holes on the wings. Slide the top rails under the
raised shingles and attach each rail to the the roof deck
with a provided deck screw (Figure 5c). Press the shingles
back down into place.
Note: You may have to tilt the panel to access the top rail
mounting holes.
Note: Apply roofing cement under the shingles to seal
THEMTOTHEROOF&INALLYREATTACHTHEh,vSHAPEDWINGS
to the rails with the provided bolts and nuts and fasten them
securely (Figure 5d).
CAUTION: THIS UNIT IS WIRED AT THE FACTORY AND
IS READY TO RUN. THIS FAN AUTOMATICALLY STARTS
WHENEVER THE SOLAR PANEL IS EXPOSED TO A LIGHT
SOURCE. ALWAYS EXERCISE CAUTION WHEN IN THE
VICINITY OF THE FAN.
6. Adjust Solar Panel
When adjusting the solar panel, be sure to tilt or rotate the
panel to maximize direct exposure to the sun. To tilt the
SOLARPANELLOOSENTHETWOSCREWNUTS(Figure 6a) on the
RAILMOUNTLINKAGECONNECTION4HENRAISETHEPANELTOTHE
desired location and re-tighten (Figure 6b).
To rotate the solar panel (for hood mount installations only),
loosen four wingnuts, rotate panel to desired position and
tighten securely.
Note: The optimum angle can be calculated by using the
approximate latitude of the house plus 20 degrees. The
solar panel should face south, when possible.
Notice: )FPARTSANDORACCESSORIESAREMISSINGORTHIS
product does not operate correctly, contact Master Flow
®
Technical Services. Do not return to retailers or distributors.
Ú'!&%LK#ORPORATIONs
Green Machine
Solar Powered Roof Vent
Installation Instructions
Ú'!&%LK#ORPORATIONs
s0ERCEUSEs4RÏPANDECMPOs#ORDOND%XTENSION
s#OUTEAU4OUT5SAGEs3CIE3AUTEUSEETOU³GNE
s,UNETTESDE3ÏCURITÏs#LOUS'ALVANISÏSÌ4OITUREs&USIL
Ì#ALFEUTRAGEs'ANTSs³CHELLEs-ARTEAUDE#HARPENTIER
s4OURNEVISs#RAYONOU-ARQUEURs3ILICONEs0INCESs
#OLLEPOUR4OITURESs4OURNE³CROUSPOUR4OITURES
,ENSEMBLECOMPRENDDESVISÌPLATELAGEBOULONS
CONTREÏCROUSENNYLONETAILESENFORMEDEh,v
MENTSDESBARDEAUX&IXERLESAILESENFORMEDEh,vENVOUS
TRACERLECONTOURDESAILESENFORMEDEh,vSURLEBARDEAUET
INTEMPÏRIESNEPASPLACERLESAILESENFORMEDEh,vOU
AVEZMARQUÏLESTROUSPOURLESAILESENFORMEDEh,vETPOUR
LESRAILSSUPÏRIEURSENLEVERLESAILESENFORMEDEh,vDU
DEh,vSOUSLEBARDEAU!LIGNERLESDEUXAILESAVECLAPORTION
BARDEAUXFIXERLESDEUXAILESENFORMEDEh,vAUPLATELAGE
ENFORMEDEh,vDÏJÌINSTALLÏES#ENTRERLESFENTESDANSLES
LESAILESENFORMEDEh,vAUXRAILSAVECLESÏCROUSETBOU
%80/3³°5.%3/52#%$%,5-2%%8%2#%24/5*/523
PANNEAUSOLAIREDESSERRERLESDEUXBOULONSÏCROUS
SURLEGUIDEDURACCORDDEMONTAGEFIXATION
Figure 1a Figure 1b Figure 1c Figure 2a Figure 2b Figure 3a Figure 3b
Figure 4 Figure 5a Figure 5b Figure 5c Figure 5d Figure 6a Figure 6b
SOUTH
M
E
ASUR
E
RIDGE LINE
15
d
ia
.
1
5
d
ia.

Summary of content (2 pages)