Specifications
DO NOT COMPLETELY TIGHTEN SCEWS UNTIL ALL
PARTS ARE IN POSITION AND CORRECT.
1A. All parts must be assembled at the same time using hardware
#5 screw (2) and #7 nut (2). Assemble the upper leg
support (FA), with the side brace (FJ) in position, to both
the front and rear left cart legs (FD and FE).
1B. Assemble the bottom brace (FG) (with notches to hold LP
tank facing upwards) to both the front and rear left cart legs
(FD and FE) using hardware #16 hinge pin (2) and #15
hitch pin (2).
DO NOT COMPLETELY TIGHTEN SCREWS UNTIL
THE ENTIRE CART IS ASSEMBLED AND CORRECT.
2A. Assemble the upper leg support (FA) to the both the front
and rear right cart legs (FB and FC) using hardware #5
screw (2) and #7 nut (2).
2B. Assemble the bottom brace (FG) (with notches facing
downward) to both the front and rear left cart legs (FD and
FE) using hardware #5 screw (2) and #7 nut (2).
3A. Attach the tank exclusion wire (EC) to the left and right
cart legs, as shown, ensuring that the large opening for the
tank is located on the left side of the cart.
3B. Assemble one of the rear braces (EA) in this step, to the
rear left and right cart legs (FD and FB) by removing the
two screws and flange nuts already assembled in the
previous step.
15
2
1
Upper Left Leg
Lower Left Leg
3
9
10
Notchs to hold LP cylinder
Tank Support Bracket
Support Bracket
FA
FJ
FD
FE
FG
FA
FC
FG
FB
Left
Right
Figure A
Figure B
Figure A
Figure B
EC
EA
FD
FB
Back view










