Installation Guide

4
CONCRETE WALL
PREPARATION
If installing into drywall - please proceed to step 7.
Position the track by measuring up from the door height
(H) + 1-3/4" to the center of the track. This ensures a
gap of 3/8" - 1/2" at the bottom. Ensure the track is level
and leave a minimum of 2" from the end of the track to
the side of the opening (as shown).
If installing with an opening for 80" standard door size,
remove the top trim and cut the side trim horizontally
along the height of the opening.
5
CONCRETE WALL
PREPARATION
Position the track in place ensuring that it is level, mark
the holes on the track using a pencil and pre-drill 5/16"
holes into the concrete using the track also as a guide.
6
CONCRETE TRACK
INSTALLATION
Important: Before mounting track, slide both stoppers
onto the end of the track inside the first hole.
Note: The stoppers are handed.
When installing directly into concrete, insert using the
provided anchors and carriage bolts (with washers).
Ensure to unscrew to separate the carriage bolt and
anchor to install correctly, securing with a wrench.
5/16” (8 mm)
Drill depth
1 3/8”
(30 mm)
78 3/4” (2000 mm)
Door height + 1 3/4”
Minimum 2”
(51 mm)
3/8” (9.5 mm),
1/2” (12.7 mm)
gap under the
door
5/16” (8 mm)
Drill depth
1 3/8”
(30 mm)
78 3/4” (2000 mm)
Door height + 1 3/4”
Minimum 2”
(51 mm)
3/8” (9.5 mm),
1/2” (12.7 mm)
gap under the
door
5/16” (8 mm)
Drill depth
1 3/8”
(30 mm)
78 3/4” (2000 mm)
Door height + 1 3/4”
Minimum 2”
(51 mm)
3/8” (9.5 mm),
1/2” (12.7 mm)
gap under the
door
Barn Door Installation Guide
BARN DOOR HARDWARE STRAIGHT STRAP KIT
©2017 Masonite International Corporation. MIC-171901
1-800-663-DOOR masonite.com
Track length