Instruction Manual

Rotational Vacuum Concentrator RVC 2-33 IR
6 Operation
36
Version 08/2009, Rev. 2.1 of 02/12/2014 • sb
Translation of the original operating manual
Pos: 129 /20 0 Ch ris t/3 70 RVC -BA (S TAN DAR DMODU LE) /06 0 Betri eb/0 60- 004 0-0030 -00 30 B eche r @ 2 5\m od_ 140 498 512 1657_68 .doc x @ 1 87233 @ 4 @ 1
6.4.3.3 Buckets
Load each bucket symmetrically to its pivotal point to ensure swinging
to 90° under rotation.
correct incorrect
at a standstill
under rotation
Fig. 15: Symmetrical loading of the buckets
The balance point of the loaded bucket must be located considerably
below the pivotal point. If the balance point is too near the pivotal point,
the loaded bucket can be levered out of the bearings.
correct incorrect
at a standstill
1 Pivotal point
2 Balance point
under rotation
Fig. 16: Loading of buckets considering the balance point
Pos: 130 /01 0 Uni v ersal mod ule/A bsc hnit tsw echs el @ 0\ mod _12021 245 140 62_ 0.docx @ 418 @ @ 1
Pos: 131 /01 0 Uni v ersal mod ule/S eit enwec hsel @ 0\m od_ 120 211 624 4312 _0. docx @ 10 5 @ @ 1