User guide

RVC 2-18 CD& HCL
8 Maintenance and service
Version 04/2012, Rev. 1.4 of 25/11/2013 • sb
59
Translation of the original operating manual
Pos: 165 /20 0 C h rist/3 71 R VC -BA (PROJ EK TE)/R VC 2-18 C D plus _ 2-1 8 CDpl us _HCl /08 0 Wa rtun g un d In s tan dhalt ung/ 080 -00 11- 001 0 De c kelsc hl össe r H Cl @ 1 4\m od_ 135 288 799 7560 _68 .doc x @ 7 480 7 @ 3 @ 1
8.1.3 Lid locks
The locking bolts of both lid locks are exposed to HCl vapours during
operation of the RVC and must be protected against corrosion by greasing
them with oil for precision engineering at least once a year.
Open the lid.
Switch off the mains power switch and disconnect the power cord.
Let the RVC cool down to room temperature, if necessary.
Put a drop of oil for precision engineering to the locking bolts of both lid
locks by inserting the oil-pen in the hook opening.
Abb. 51: Hook openings of the lid lock
Pos: 166 /01 0 Univ ersal module/ Lee rzeile @ 0\ mo d_12021 162445 00_ 0.docx @ 1 14 @ @ 1
Pos: 167 /20 0 Ch ris t/3 70 RVC -BA (S TAND AR DMODULE ) /08 0 Wart ung un d Inst and haltu ng/ 080 -001 0- 0030 Z ube hör @ 8\ mod_1 3100 265 340 81_ 68.d ocx @ 472 71 @ 3 @ 1
8.1.4 Accessories
CAUTION
For the care of the accessories, special safety measures must be
considered as these are measures that will ensure operational safety at
the same time.
Chemical reactions as well as stress-corrosion (combination of oscillating
pressure and chemical reaction) can affect or destroy the metals. Barely
detectable cracks on the surface can expand and weaken the material
without any visible signs.
Check the material regularly (at least once a month) for
cracks
visible damage of the surface
pressure marks
signs of corrosion
other changes.