User guide

RVC 2-18 CD& HCL
1 General information
10
Version 04/2012, Rev. 1.4 of 25/11/2013 • sb
Translation of the original operating manual
Pos: 8 /2 00 C hrist/ 370 RV C -BA (STAND ARD MODU LE )/010 A llge mein e Inf or matio nen/ 010-00 40 U rhebe rrec ht @ 8\m od_131 597 7787 006 _68 .docx @ 50613 @ 2 @ 1
1.4 Copyright
The copyright concerning the operating manual remains with Martin Christ
Gefriertrocknungsanlagen GmbH.
The operating manual is solely intended for the operator and their
personnel. It includes instructions and information that may not be
duplicated,
distributed, or
communicated in any other way neither in full nor in parts.
Non-compliance may be prosecuted under criminal law.
Pos: 9 /010 U nivers almo dule/ Le erz eile @ 0\m od_ 1202116 244500 _0.docx @ 114 @ @ 1
Pos: 10 / 200 C hrist /37 0 R VC -BA (STAN DA RDM OD ULE)/ 010 A ll g emei ne I nfor mati one n/01 0-0 050 Z eic he nerkl äru ng @ 8\ mod_ 131 597 778 733 5_6 8.doc x @ 5 062 1 @ 2 @ 1
1.5 Explanation of symbols
In this operating manual, the specialist terms that are explained in the
glossary (see chapter 12 - "Glossary") are marked by an arrow and printed
in italics (e.g. safety pressure).
Pos: 11 /010 Unive rsalm odule/ L ee rzeile @ 0\ mod _120211 624450 0_0.docx @ 11 4 @ @ 1
Pos: 12 / 200 Chri st /37 0 RVC -BA (STAN DAR DM ODULE )/ 010 Al lg emei ne I nfor mati one n/01 0-0 060 N o rmen un d V ors chrif ten @ 8\ mod _13 159 7778766 5_6 8.do c x @ 5 0629 @ 2 @ 1
1.6 Standards and regulations
EC-Declaration of conformity (see appendix)
Pos: 13 /010 Unive rsalm odule/ L ee rzeile @ 0\ mod _120211 624450 0_0.docx @ 11 4 @ @ 1
Pos: 14 / 200 Chris t /37 1 RVC-B A (P ROJE KTE) /R VC 2-1 8 CD pl us_2 -18 CD plus _HCl /010 A llgem eine Info rm ation en/0 10- 007 1 Li efe rumfang HC l @ 1 2\m od_ 133 5169515 010 _68 .docx @ 62 881 @ 2 @ 1
1.7 Scope of supply
The scope of supply comprises:
1 O-ring 6x1
1 O-ring 10x1
1 O-ring 18x2
1 O-ring 21x3
1 ball bearing 608-ZR02 T9 (ceramic)
1 ball bearing 6001-ZR02 T9/C3 (ceramic)
1 oil pen (oil for precision engineering) for the lid locks
1 ball bearing installation tool
1 centring ring (Vacuum connection to the rotor chamber)
1 tension chain
1 socket wrench (size 5.5)
1 operating manual
Fig. 1: Scope of supply