Manual

Freeze-dryer EPSILON 2-6 LSCplus
6 Operation
42
Version 10/2012, Rev. 1.6 of 16/12/2014 • sb
Translation of the original operating manual
Pos: 122 /20 0 Ch rist/3 60 G T-BA Labo r-Pi lot (STAN DA RDMODU LE )/0 60 Bet rieb/ 060 B etri eb= === ==== === ==== ===== == ===== == ===== == ==== @ 25\ mod_14 049 837 597 58_6 8.d ocx @ 183578 @ 1 @ 1
6 Operation
Pos: 123 /20 0 Ch rist/ 360 G T-BA L abor-P ilot (S TANDA RDMOD U LE)/0 60 B et rieb/ 060 -0010 E rst e Inbe tri ebnah me ++ +++++ ++ +++++ +++++ ++ ++++ + @ 2 5\m od_140 4983 760 674 _68. docx @ 18 359 2 @ 2 @ 1
6.1 Initial start-up
WARNING
Before the initial start-up, please ensure that your freeze-dryer is properly
set up and installed (see chapter 5 - "Set-up and connection")
Pos: 124 /01 0 Uni v ersal mod ule/L eerz ei le @ 0\m od_ 120 211624 450 0_0. doc x @ 11 4 @ @ 1
Pos: 125 /200 Ch ris t/360 G T-BA L abo r-Pil ot (STA NDA RDMODU LE )/0 60 Bet rieb/ 060-00 20 Instal l ation v on Zu behörko mpo nent en+++ ++++ +++ ++++ +++++ +++ @ 25\mod_ 140 498 376184 0_68 .docx @ 1836 07 @ 2 @ 1
6.2 Installation of accessories
The accessories must be completed in accordance with the drying method
that is applied as well as in accordance with the scope of supply.
The installation instructions can be found in a separate document. Please
contact our sales department if you have any queries.
Pos: 126 /01 0 Uni v ersal mod ule/L eerz ei le @ 0\m od_ 120 211624 450 0_0. doc x @ 11 4 @ @ 1
Pos: 127 /20 0 Ch rist/3 60 G T-BA L abor-P ilot (STA NDA RDMOD U LE)/0 60 Bet ri eb/ 060-00 30 V orb ereit ung ++ +++++ +++++ ++ +++++ ++ ++++ +++++ ++ ++ @ 25\ mod _14 049 837 628 63_68.d oc x @ 183 620 @ 2 @ 1
6.3 Preparation
The ice condenser chamber must be clean and dry.
Remove any water residues from the preceding run.
Close the media drain valve and the aeration valve.
Ensure that all of the valves of the accessories are closed.
Switch the vacuum pump on.
Pos: 128 /01 0 Uni v ersal mod ule/L eerz ei le @ 0\m od_ 120 211624 450 0_0. doc x @ 11 4 @ @ 1
Pos: 129 /20 0 Ch rist/3 60 G T-BA Labo r-P ilot (STA NDA RDMODU LE )/060 B et rieb/ 060 -0040 Ei n schalt en (Haup t- u nd N etzsch alter ) + ++++ +++ ++++ +++++ ++ +++++ ++ +++++ ++++ +++ @ 25\m od_1 404 983 763 907_68. doc x @ 18 363 4 @ 2 @ 1
6.4 Switching the freeze-dryer on
NOTE
The freeze-dryer is equipped with a main switch and a mains power switch
(see chapter 2.1.1 - "Functional and operating elements"). The main switch
establishes the mains power supply and the mains power switch supplies
the control system of the freeze-dryer with power.
Actuate the main switch
Actuate the mains power switch.
The LSCplus control unit performs a self-test and an initialisation. This may
take several seconds.
Follow the safety instructions and hazard warnings (see chapter 3 -
"Safety")!
Pos: 130 /01 0 Uni v ersal mod ule/S eit enwec hsel @ 0\m od_ 120 211 624 4312 _0. docx @ 10 5 @ @ 1