User Manual
Delta 1-24 LSC&
Delta 2-24 LSC&
6 Operation
38
Version 04/2013, Rev. 1.2 of 20/02/2014 • sb
Translation of the original operating manual
Pos: 111 /01 0 Univ ersal module/ Sei tenwe chsel @ 0\ mod_12 0211624 4312_0 .docx @ 105 @ @ 1
Pos: 112 /20 0 Ch ri st/3 60 G T-BA L abor-P ilot (S TAND AR DMODU LE )/0 60 Bet ri eb/ 060 B etrie b= === ==== === == ===== == ===== == ==== === ==== == @ 6\m od_ 129 913 739 277 9_68 .docx @ 3 506 2 @ 1 @ 1
6 Operation
Pos: 113 /20 0 C hri st/3 60 G T-BA L abo r-Pil ot (STAN DAR DMODU LE )/060 B et rieb/ 060 -00 10 E rs te I nbe trie bnah me +++++ ++ +++++ ++ ++ +++++ ++ +++ @ 6 \mo d_1 299 1373 932 48_ 68.d ocx @ 350 70 @ 2 @ 1
6.1 Initial start-up
WARNING
Before the initial start-up, please ensure that your freeze-dryer is properly
set up and installed (see chapter 5 - "Set-up and connection")
Pos: 114 /01 0 Univ ersal module/ Lee rzeile @ 0\ mo d_12021 162445 00_ 0.docx @ 1 14 @ @ 1
Pos: 115 /200 Ch ris t/360 G T-BA L abo r-Pil ot (STA NDA RDMODU LE )/0 60 Bet rieb/ 060-00 20 Instal l ation v on Zu behörko mpo nent en+++ ++++ +++ ++++ +++++ +++ @ 6\mod_1 299 137 393670 _68. docx @ 35079 @ 2 @ 1
6.2 Installation of accessories
The accessories must be completed in accordance with the drying method
that is applied as well as in accordance with the scope of supply.
The installation instructions can be found in a separate document. Please
contact our sales department if you have any queries.
Pos: 116 /01 0 Univ ersal module/ Lee rzeile @ 0\ mo d_12021 162445 00_ 0.docx @ 1 14 @ @ 1
Pos: 117 /20 0 Ch ri st/3 60 G T-BA L abo r-Pil ot (STAN DAR DMODU LE)/0 60 B et rieb/ 060 -00 30 V orb ereit ung ++ +++ ++++ +++ ++ +++++ ++ ++++ +++ ++++ ++ @ 6\m od_ 129 913 739 402 9_6 8.docx @ 3 508 6 @ 2 @ 1
6.3 Preparation
The ice condenser chamber must be clean and dry.
• Remove any water residues from the preceding run.
• Close the media drain valve and the aeration valve.
• Ensure that all of the valves of the accessories are closed.
• Switch the vacuum pump on.
Pos: 118 /01 0 Univ ersal module/ Lee rzeile @ 0\ mo d_12021 162445 00_ 0.docx @ 1 14 @ @ 1
Pos: 119 /20 0 Ch rist/3 60 G T-BA L abo r-Pil ot (S TAND ARD MODU LE)/0 60 Bet ri eb/060 -00 40 Ein schal t en (Haup t- u nd N etzsch alt er) + ++++ +++ ++++ +++++ ++ +++++ ++++ +++ ++++ +++ @ 1 6\m od_1 360317 135 691 _68. docx @ 80 921 @ 2 @ 1
6.4 Switching the freeze-dryer on
NOTE
The freeze-dryer is equipped with a main switch and a mains power switch
(see chapter 2.1.1 - "Functional and operating elements"). The main
switch establishes the mains power supply and the mains power switch
supplies the control system of the freeze-dryer with power.
• Actuate the main switch
• Actuate the mains power switch.
The LSC
plus
control unit performs a self-test and an initialisation. This may
take several seconds.
• Follow the safety instructions and hazard warnings (see chapter 3 -
"Safety")!
Pos: 120 /01 0 Univ ersal module/ Sei tenwe chsel @ 0\ mod_12 0211624 4312_0 .docx @ 105 @ @ 1