THE SHALLECK COLLABORATIVE SANTA ROSA CITY COUNCIL
AV SYSTEMS UPGRADE
April 6, 2012 27 41 16 4 AV SYSTEMS
100% CD
i. Provide a furniture system for the broadcast control desk as shown in the drawings.
1) Base module: Winsted LCD/3 Console with central cableway, floor levelers,
footrest and all necessary hardware.
2) Finishing Panels: Provide exterior steel finishing panels for sides & top of
assembly. All steel parts shall be provided in black, all wood parts shall be
finished using a manufacturer standard laminate, to be determined during the
submittal phase.
3) Work Surface. Provide continuous work surface, made of MDF with high
pressure laminate.
4) Provide sliding rack drawers for any unused rack space in the lower rack section,
and provide blank panels for any unused rack space in the upper section.
j. Monitor Mount
1) Provide floorstanding monitor mount for broadcast multiviewer and CATV
confidence monitors.
2) Fieldlocate monitor stand based on final layout of production switcher operator.
6. Existing Equipment Racks & Equipment Presentation
a. Currently, the council chamber presentation equipment resides in two separate
equipment racks. While the system generally works OK, it is hard to troubleshoot
and needs a general cleanup. In order to facilitate this, the two (2) existing racks will
be removed, and all equipment will be moved into one new fullheight swingout rack.
It is in the scope of this work to complete the move, including any new wiring
extensions required. We have endeavored to place the rack where the least amount
of extension would be needed.
b. Follow industry bestpractices for installation, including proper lacing bars, cable
strain relief, and associated methods.
c. Provide rack mount kits for any device in the rack that is not currently rackmounted.
d. New power, power raceways, and an isolated ground buss bar will be added to the
rack. Coordinate with the electrical contractor for proper installation.
e. After the equipment is moved and connected, it is in the scope of this work to confirm
all equipment is properly functioning, and operates as it did prior to the move.
7. Existing Equipment Racks & Equipment Data/IT systems
a. Currently, the council chamber data equipment resides in a small open frame wall
mounted rack. In order to facilitate system growth, the rack will be removed, and all
equipment will be moved into one new fullheight floormount openframe rack. It is
in the scope of this work to complete the move, including any new wiring extensions
required. We have endeavored to place the rack where the least amount of
extension would be needed.
b. Follow industry bestpractices for installation, including proper lacing bars, cable
strain relief, and associated methods. The final product should have a workmanship
like quality.
c. New power, power raceways, and an isolated ground will be added to the rack.
Coordinate with the electrical contractor for proper installation.
d. After the equipment is moved and connected, it is in the scope of this work to confirm
all equipment is properly functioning, and operates as it did prior to the move.
B. Presentation Systems
1. Demolition