Specifications
THE SHALLECK COLLABORATIVE SANTA ROSA CITY COUNCIL
AV SYSTEMS UPGRADE
April 6, 2012 27 41 16 16 AV SYSTEMS
100% CD
9) Provide Middle Atlantic “CLAW14” patchcord holder, one per rack.
b. Patchbay layout shall be in standard “output at top, inputs at bottom” scheme with
clear method for showing normals. Contractor shall be responsible for exact
patchbay layout.
c. Labeling shall be as follows:
1) All labeling shall exactly match circuit in field.
2) Labeling shall be sequential per circuit type, beginning at 1.
d. Or equal by AVP, Inc.
2. Composite/HDSDI Production Video:
a. Provide Bittree Video WECO Composite series HiDefinition patchbay.
b. Provide the following configuration:
1) WECOstyle connectors
2) 2x26 jacks with 12” deep chassis
3) 2 designation strips in over/under configuration
4) 2 RU
5) Normals per Drawings
6) Black in color
7) Paper designation strips. Provide .doc file to Owner for future use.
8) Provide Middle Atlantic “CLAW14” patchcord holder, one per rack.
c. Or equal by AVP, Inc.
3. Data:
a. RJ45
1) Leviton Gigamax 6series patchbays.
2) Or Equal
4. Bulkhead Patchbay (West College)
a. Provide AVP, Inc, Universal Bulkhead system, model WKU212E2Z, loaded with the
appropriate connectors.
b. Provide blanks in unused positions.
c. Provide paper designation strips. Provide .doc file to Owner for future use.
d. Provide Middle Atlantic “CLAW14” patchcord holder, one per rack
2.05 PANELS:
A. General: The control receptacle panels shall consist of the appropriate connectors required
for the system.
B. Physical:
1. Faceplates shall be 0.080” aluminum, edges eased, finished in fine texture, scratch
resistant powder coat, with fasteners countersunk.
a. Panels specified as flush mounted shall overlap back box by 1/2”. Surface mounted
panels shall match back box size with no gaps or overlap.
b. Coordinate back box type, size and mounting with Division 26.