Technical data

EPI New Delhi Volume-2B, Rev.0 Page 8 of 11
GUARANTEE AND PENALTIES
The Contractor will guarantee individual as well as integrated performance of all
the equipment supplied by them for period as stipulated in the GCC prior to the
date of issue of taking over certificate by the Employer. The final acceptance
certificate will be issued by the Employer after successful commissioning of the
Plant by the Contractor showing all the performance test at specified parameters.
The following parameters will be guaranteed at 35
0
C, 60% RH, 33
0
C cooling
water temp., 50Hz frequency.
Air Compressor:
* Rated Capacity at lowest : 36 Nm
3
/ min (each)
frequency
* Rated discharge pressure : 8 kgf/cm
2 (
g)
at the outlet of after cooler
* Discharge temperature after : 45
0
C
after cooler at rated capacity
and pressure
* Oil content in the air at the : Oil free
outlet of air compressor,
* Specific Power consumption : To be indicated by the
of the compressor at the rated Contractor
condition mentioned above (kwh/Nm3)
* Noise Level : 80 dB(A)
* Volumetric efficiency of each : To be indicated by the
compressor Contractor
* Inter cooler/ After cooler : 0.2 kgf/cm2 (max)
pressure drop
Tolerance on guarantee values of energy consumption,
volumetric efficiency, intercooler & after cooler pressure drop is
± 0.00%