34. Other Drawings/documents :
a) Operation & maintenance manual.
b) Catalogues and manuals.
c) All ”As-built” drawings.
d) Soft copies of all drawings.
e) Technical specification/data sheet of equipment.
f) Instructions for storage/erection/testing/commissioning
g) Commissioning report.
The Contractor will submit all the drawings in Si-graph or equivalent
format along with the multi user system software.
D. As built drawings
Upon installation and commissioning supplier will incorporate revisions/
modifications if any in the reproducible and submit 'as built' drawings for
EMPLOYER's record as per general condition of contract.
Complete and comprehensive instruction manuals for operation and
maintenance of the equipment with drawings. This will include the
following:
1. Log sheets indicating daily/hourly recordings of power system
parameters to be noted down by customers operating personnel.
The parameters will indicate loading of various electrical equipment
quality of power supply, energy consumption of various units,
energy consumption and maximum demand of the plant.
2. Preventive maintenance schedule for equipment.
3. Procedure for shut down and energisation.
4. Safety procedures for safe operation of equipment and complete
system.
5. Specification of equipment installed.
6. Test procedure for site tests.
7. All as built drawings.
8. Spares list for each equipment for 2 year operation and
maintenance.
9. At least two sets of clearly legible site corrected drawings will be
submitted after commissioning