Technical data

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL &
ILLUMINATION ELECTRICAL
Page 36 of 50
2. HT/LT feeder requirement with individual maximum demand.
3. Control circuit diagrams. The control circuit diagram should be
available on / inside of respective panel / LCS.
4. Static and dynamic loading of all major equipment
5. External connection diagram (panel wise and scheme wise).
6. Composite drawings showing circuitry of switch-gear remote
panels, and other items pertaining to complete circuit for its
proper functioning.
7. Power & regulation schemes for AC drive, UPS, soft starter
including FCMA type.
8. Motors & field devices.
9. Speed-torque, current vs. time, thermal withstands characteristics
for motors.
10. List of interfaces between Contractor’s equipment and
EMPLOYER’s equipment.
11. Cable termination plans with terminal block arrangement and
markings.
12. Interconnection diagrams.
13. Internal wiring diagrams of equipment.
14. Fire detection systems: layout & cable list.
15. Motor and electric consumer list.
16. Consolidated Bill of materials and volume of work for erection.
17. Procedure for testing and commissioning of the entire plant,
electrical & automation equipment. This will also be furnished in
soft copy.
18. Erection specification with bill of materials of erection materials,
earthing materials, junction box, GI conduits etc. This will also be
furnished in soft copy.
19. Spare part list and drawings.
20. Instruction for storage /erection, testing & commissioning.
21. Operation and maintenance manual.