Technical data
CHAP-03 BRIEF SYSTEM DESCRIPTION Page 20 of 20
Rerouting of these conveyor series shall be so meticulously planned that
minimum shut down is required in the existing plant. Design, supply,
erection, commissioning and performance guarantee test of the Re-
routed conveyors are under the scope of the Contractor. Existing
equipments/ components of dismantled (by the Contractor)
conveyor/gallery/ junction houses shall not be re-used.
All Proposed junction houses shall have Electric hoist. The capacity & lift
may be followed as per CS. Junction houses (where these facilities are
not considered) of below 6m height shall have suitable capacity ( 2t min.)
manual hoist and more than 6m height shall have at least 5t cap electric
hoists. Under slung & EOT cranes as specified in CS and other handling
facilities as specified in system description shall be provided.










