Technical data

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 11 of 20
24. Wagon loading shall be provided for BF coke in the coke screening
station of CSP-4.
25. Maintenance post with Air Conditioned Supervisors room along with shift
in changes room and toilet block is to be provided in the Coke Screening
Station.
Conveyor belt width, troughing angle and belt width will be properly
selected to prevent coke spillage. Conveyor galleries, buildings will
follow IPSS norms and will be provided with adequate maintenance
facilities and space.
Coke crushing station, coke screening station, coke bunkers and
junction house no. 1 & coke dedusting unit shall be of civil construction
upto the top floor, above which it shall be of steel structure.
Other Junction Houses & travelling Tripper Bridge shall be of steel
structure with RCC flooring.
Electric hoists/ manual hoist of suitable capacity & lift shall be provided
in each junction house & buildings to cater to the maintenance needs.
Electric hoists shall be provided wherever height of lift is more than 6
meters.