Technical data
CHAP-04.11 AUTOMATION
Page 14 of 15
03. Control room and Despatcher will also have facility of Toilet block.
Central control room will have one conference room (with Table &
Chairs for 12 persons) & Pantry. However Contactor may
accommodate some of these facilities on floor below Control room
also, during detail engineering.
04. Control desk (for installation of HMIs & Engineering Stations etc) will
be of most modern & aesthetic design with Cable Management
system.
04.11.05 LIST OF DRAWINGS & DOCUMENTS
Following drawings and documents will be submitted by the Contactor:
A. TO BE SUBMITTED BY THE CONTACTOR DURING DETAILED
ENGINEERING
I) FOR APPROVAL:
01. Finalised system configuration diagram for the automation system
along with its peripherals with list of hardware and write-up on the
system.
02. Bill of Materials & Data Sheets of all the hardwares i.e. Processors,
Communication modules, Power supply cards, RLM, OLM, Operator
stations, Eng Stations, Servers, Bus cables etc.
03. Overall General arrangement drawings & sectional views of various
cabinets, panels, consoles, etc., showing internal disposition of all
components/ units, with dimensional details and bill of materials.
04. Interconnecting diagram between existing MCCs & other panels of
employer and PLC / Remote I/O stations of the Contactor.
05. Single line power supply diagram with specification and bill of
quantities of electrical accessories.
06. Quality assurance plan & Factory Acceptance Test procedures for
Automation system.
07. Control room layout drawing showing disposition of panels, consoles,
desks, etc with dimensional details.
II) FOR SCRUTINY AND REFERENCE
01. Detailed technical literature/ catalogue for Automation system with
peripherals, highlighting the model number.