CHAP-04.11 AUTOMATION
Page 4 of 15
with CHP (Pkg-062), new Coke Oven Battery-11 & existing plants /
shops as per Technological Material Flow Diagram for information
exchange, interlocking and monitoring of the plant. Contactor will provide
required hardware & software for interfacing of the offered automation
system with the automation system of the above plants. The required
communication bus from the PLC of the above plants to respective
Despatcher / Control Room of the Contactor’s offered Coal Handling
Plant will be included under this package. Details of interfacing
requirement will be finalised during detailed engineering stage.
Coke Sorting Plant: Automation systems of CDCP (for Coke Oven
Battery-11), Stock House of Blast Furnace # 8, etc. will be separately
arranged by Employer along with its technological package. The PLC
based automation system of CSP (Pkg-064) will be interfaced with
CDCP (for Coke Oven Battery-11), Stock House of Blast Furnace # 8,
Augmentation in Flux - Fuel Preparation and Plant Return Fines
Handling for SP III (Pkg-64) & existing CSP 1 plant as per Technological
Material Flow Diagram for information exchange, interlocking and
monitoring of the plant. Contactor will provide required hardware &
software for interfacing of the offered automation system with the
automation system of the above plants. The required communication
bus from the PLC of the above plants to respective Despatcher / Control
Room of the Contactor’s offered Coke Sorting Plant will be included
under this package. Details of interfacing requirement will be finalised
during detailed engineering stage.
Augmentation in Flux - Fuel Preparation and Plant Return Fines
Handling for SP III: Automation systems of Blast Furnace #8, Sinter
Plant#3 etc. will be separately arranged by Employer along with its
technological package. The PLC based automation system of
Augmentation in Flux - Fuel Preparation and Plant Return Fines
Handling for SP III (Pkg-064) will be interfaced with stockhouse of Blast
Furnace #8, Sinter Plant #3, CSP (Pkg-64) , Existing Coke handling,
crushing and screening facility, Existing Flux crushing and screening
facility, etc. as per Technological Material Flow Diagram for information
exchange, interlocking and monitoring of the plant. Contactor will provide
required hardware & software for interfacing of the offered automation
system with the automation system of the above plants. The required
communication bus from the PLC of the above plants to respective
Despatcher / Control Room of the Contactor’s offered Augmentation in
Flux - Fuel Preparation and Plant Return Fines Handling for SP III will be
included under this package. Details of interfacing requirement will be
finalised during detailed engineering stage.
11. The Automation system facilities for CHP, CSP and Augmentation in
Flux - Fuel Preparation and Plant Return Fines Handling for SP III of this
package (064) will be generally offered inline with the basic ‘Automation
System Configuration’ diagram (Drg. No:
MEC/S/9101/11/E9/55/01/064.01/R1) for CHP & Drg. No: