CHAP-04.11 AUTOMATION
Conveyors feeding to Augmentation in Flux - Fuel Preparation and Plant
Return Fines Handling for SP III i.e. C7-3.5KW, C1-30KW & C2-45KW
will be fed from new MCC under the scope of package. These
Conveyors will be connected from new PLC of Augmentation in Flux -
Fuel Preparation and Plant Return Fines Handling for SP III. Suitable
control cable and other accessories will be considered.
Necessary modification, if required for laying of cables and mounting
equipment in the existing control room CR1, the same will be provided
by the Contractor.
06. This specification should be read together with the General Technical
Specification (No. GS-03) separately attached with this specification,
General Conditions of Contract (GCC) and other commercial terms &
conditions.
07. Automation equipment considered for the process will be complete in all
respect in line with this specification. Any equipment / accessories, not
explicitly indicated in this specification, but considered essential for
proper functioning of technological equipment and process (including
utilities) will be included by Contactor in their scope of work and supply.
08. All the automation equipment will be supplied brand new & from the
latest product ranges of reputed manufacturers as per the List of
Preferred Makes, furnished in this Contract document. Employer/
Consultant reserve the right of selecting particular make and model of
Automation equipment with a view of integration with employer’s
Automation system and standardization of the whole plant. Contactor will
comply with such requirements.
09. Contactor will execute the entire automation work as part of turnkey
package of the CHP and CSP, Augmentation in Flux - Fuel Preparation
and Plant Return Fines Handling for SP III to the satisfaction of
Employer/ Consultant. Contactor will comply with all the requirements
indicated under General; Salient Features of Automation system, Scope
of Work and Supply; Submission of Drawings & Documents and other
related clauses/ annexure stipulated in this specification. Design aspects
and selection criteria of PLC systems and also other hardware/
peripheral units have been elaborated in GTS. The GTS (GS-03) is
being issued as a separate document along with this Contract, which will
also be complied with.
10. Interfacing:
Coal Handling Plant: -Automation systems of CHP (Pkg-062), new
Coke Oven Battery-11, etc. will be separately arranged by Employer
along with its technological package. The proposed PLC based
automation system of Coal Handling Plant (Pkg-064) will be interfaced