User manual

7
Hoisting clips are provided for ease of unloading and positioning
the fluid cooler. For overhead lifts or where additional safety is
required,safetyslingsshouldalsobeplacedundertheuidcooler
modules. Under no circumstances should you combine the top and
bottom modules of modular models and attempt to hoist them at
the same time by utilizing the hoisting clips alone!
Fluid Cooler Installation
These installation instructions are intended to help you prepare
beforeyouruidcoolerarrives.Ifdiscrepanciesexistbetweenthese
instructions and those shipped with the fluid cooler, the instructions
shipped with the fluid cooler will govern.
1. Prior to placement of the fluid cooler, confirm that the supporting platform
is level, and that the anchor bolt holes are correctly located in accordance
with Marley drawings. If your installation uses vibration isolators to dampen
vibration, they must mounted below the supporting steel. See support
drawings for further information.
2. Place bottom module on your prepared supports, aligning anchor bolt holes
with those in your supporting steel. Make sure that the orientation agrees
with your intended piping arrangement. Attach fluid cooler to supporting
steel with
3
4" diameter bolts and flat washers (by others). See support
drawing for location and quantity. Position flat washers between the bolt
head and the fluid cooler basin flange.
Note
Installation
Warning