User manual

19
Warning
Warning
Warning
Caution
atmospheric moisture from the entering air. Such lightly wetted areas are
most subject to freezing.
Therefore, if excessive ice forms on the louvers, stop the fan for a few
minutes. With the fan off, the water flow will increase in the vicinity of the
louvers and reduce the ice buildup.
3. Under extended extreme cold conditions, it may be necessary to operate
the fan in reverse. This forces warm air out through the louvers, melting any
accumulated ice—adequate heat load must be available. Reversal may be at
either full or half speed; however, reversal at half speed is recommended.
Reverse operation of the fan should be used sparingly and should only
be used to control ice, not to prevent it. Reverse fan operation should not
need to exceed 1 or 2 minutes. Monitoring is required to determine the time
required to melt accumulated ice.
Reverse operation of fans for prolonged periods during subfreezing
weather can cause severe damage to fans and fan cylinders. Ice can
accumulate inside fan cylinders at fan blade plane of rotation and
fanbladetipswilleventuallystrikethisringofice,damagingthe
fan blades or cylinder. Ice can also accumulate on fan blades and
be thrown off, damaging fan cylinder or blades. Allow a minimum
of 10 minute delay between reverse operation and forward opera-
tion during subfreezing weather to permit ice to dissipate from fan
blades and fan cylinders. See Fan Drive Caution note on page 12
for fan speed change and reversing precautions.
Intermittent Wintertime Operation:
If periods of shutdown (nights, weekends, etc.) occur during freezing weather,
measures must be taken to prevent the water in the cold water basin—and all
exposed pipework—from freezing. Several methods are used to combat this,
including automatic basin heater systems and pump freeze protection systems
available from Marley.
Basin heaters systems will not prevent the coil from freezing.
Unless some means of freeze prevention is incorporated into your
system,thetowerbasinandexposedpipeworkshouldbedrained
at the beginning of each wintertime shutdown period.
If tower basin is drained, verify that all basin heaters have been shut
off either by automatic cutoff or disconnect switch.
Operation