Instruction Manual

INSTALLATION & OPERATION MANUAL 14-0268 REV 9 (07/22)
PAGE
8
OF 20
SIRIUS II - 
I

Damage Inspection: Reporting shipping damage is the responsibility of the purchaser.

packaging for damage. Remove wrapping. Inspect the exterior of the Sirius II for visible shipping damage.
Unpacking / Removal from Pallet: To remove the steamer from the pallet, carefully cut the strapping. Make sure the pan
racks, water reservoir cover and standpipe installed inside the steamer have not become dislodged during shipping.
Assembly
Legs / Caster Installation: Install 4 legs or casters (shipped inside the steamer) into the threaded mounting holes located
on the base of the unit. If casters are supplied, locking casters should be on the front of the steamer.

1. Position the heat shield so that the notch in the shield is in the front right of the unit.
2. Use screw, lockwasher, washer and spacer to secure the heat shield as shown.

98% of all maintenance and service can be done from the front or left side. The Sirius II steamer must be installed under
a properly designed ventilation hood. (See Venting). A minimum of 6” clearance from adjacent equipment on the left side

WARNING

I