Specifications
4
INSTALLATION
Installation Instructions
1. Select a location to provide drainage directly below
the pour path of the kettle. Position appliance to al-
low sufcient rear clearance from wall to tilt freely and
completely without obstruction.
2. Mark hole locations through anged adjustable feet.
Remove kettle.
3. On hole locations marked, drill holes and insert ex-
pansion shields to accommodate 5/16” size lag bolts.
4. Reposition kettle. Level kettle by making necessary
adjustments on anged feet.
5. Bolt down kettle and seal with Silastic or other equiv-
alent sealing compound. Sealant must be applied
not only to bolt heads but also around anges making
contact with oor surface to fulll NSF International
requirements. Wipe off excess sealant immediately.
6. A control box with power supply equivalent to elec-
trical rating of kettle should be located conveniently
nearby.
7. A waterproof electrical connection from power supply
to rear of control housing must be provided.
8. Ground kettle to terminal provided inside control
housing.
9. Turn power ON and check for proper operation.