Operating instructions

15
InstallatIon
Door Assembly
Door Handle
Part No. 10-0657
Figure 41
Item Description Part No.
1 Left Door 98-3629
2 Right Door 98-3589
3 Door Top Latch (2) 99-5946
4 Door Lock Latch 98-3595
5
Left & Right Vertical Door Liner
Gasket (2 pieces)
98-3611
6 Horizontal Door Liner Gasket (2) 98-3610
NOTE: 9 Parts Total
1. Install horizontal liner gasket (6) on top andbottom of
the front frame weld assembly using #8-32 pan head
screws.
2. Install left and right vertical door liner gaskets (5) us-
ing #8-32 pan head screws.
3. Install the two door top latch (3) in the top-middle of
the front frame weld assembly using #8-32 counter-
sunk screws.
4. Install left and right door (1-2). Fasten door bearing
using #10-32 at head countersunk screws and nuts.
NOTE: Adjust doors as necessary to properly align them.
may require a few adjustments. This is very im-
portant. Door lock latch (4) will not be installed at
this time.
Figure 42
Figure 43