‘MATEY HEATER CORP. Congratulations! You've just purchased a new Mara ECOCIDE thankless water heater and will soon begin to enjoy the benefits of “going thankless” Take the time to thoroughly read and understand this safety and installation manual in its entirety before you attempt to install your new ECOL thankless water heater, as it obtains important safety tips and instructions. Please carefully read all Instructions and warnings. Should you have any questions, please visit www.
QUICK START GUIDE EC0150 1) Mounting Plot the three holes for the mounting screws onto the wall, Mount vertically on a flat surface {i.e. board or wall) larger than the unit itself. Make sure heater Ts secure by utilizing a stud or the provided wall anchors. Keep away from any potential splashing or leaking water and strong magnetic fields, 2) Water Connections Plumbing connections are ¥2" NPT, and both the inlet and outlet can be found at the bottom of the unit.
they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety. Children should be supervised to ensure that they do not play with the appliance. &. This appliance MUST be permanently connected to the fixed circuit breaker and it must be installed vertically. DO NOT install this appliance near tinder or a strong magnetic field place. 7.
TECHNICAL SPECIFICATIONS AND INSTALLATION REQUIREMENTS Product Core coiner Voltage 208V ~ 240V Power SLEW ~ 14.6kW Win. Required Rouault TOA Breaker Size Double Pole Breaker Max. Amperage 60.84 Recommended Wire Size AWE Min. Water Flow ta Activate the Unit 0.53 GPM /limiting Safe Operating Pressure 5 PSI-B PSI Water Connections at NPT 7 Temp, Increase : . = per GPM Installation Mounted Vertically a 16 B8F Temperature Setting Digital Pane! 2 2 mr Dimensions B7x 14.2" x35 8.
+ INSTALLATION DIAGRAM Fig. 03: Open the front cover, connect the cable to the terminal blocks, and please notice Fixed installation on the wall Locate an appropriate place on a section of the wall as mentioned above. the guidance logo below the terminal blocks. Fig. 01: Front and back of the appliance, Fig. 04: Connect PCE row line of the frond cover to PCB of the back cover, and then fix the front and back cover with locking screws. Fig.
Fig. 05: Mark three mounting holes on the wall according to the following picture, then drill three holes of 6.00mm diameter. Put expansion bolts in the holes, and then screw the self tapping screws Into the expansion bolts. 128° Sm Fig. 06: Fix the appliance on the mounting screws. 12 Fig. 07: Connect the water pipe to the water inlet and water outlet connections, please remember to install the rubber seal ring. Outlet Inlet Water connections 1.
5. Before beginning any work on the electric installation, be sure that the main breaker panel switch is OFF to avoid any danger of electric shock. Al mounting and plumbing must be completed before proceeding with electrical hook-up. OPERATING INSTRUCTIONS 1. Turn on the circuit breaker to bring electrical power to the unit. 2. Open the water faucet for a few minutes until the water flow is continuous and all the alr Is purged from the water pipes. The unit must operate after the breakers are turned ain. 3.
CUSTOMER SERVICE CL HER PRODUCTS At Mara, we pride ourselves on the excellence of our customer service and support Mara proudly manufactures water heaters and accessories for use in almost any {eam. application. Please visit our website io learn more about other Mara products. Please feel free to contact us if you have any questions about our products, warranty service, or if you need assistance installing a unit.