Installation manual
NOTE: 
COMBUSTION AIR  INLET 
DUCTS 
MUST 
NOT 
VENTILATED 
CRAWL 
TERMINATE 
IN 
AlTlC SPACE. 
SPACE 
INSTALLATION 
COMBUSTION 
llmTmk 
AIR 
INTAKE 
I 
INSTALLATION  VENTlLATED CRAWL 
FIGURE 
8A 
SPACE 
INSTALLATION 
(OPTIONAL) 
I 
OUTSIDE 
WALL 
INSTALLATION 
STEP 
1 
: 
A 
4-112" 
diameter opening will 
be 
required for 
installation 
of 
the air inlet assembly.  Cut  hole where 
no 
obstructions 
are 
expected,  Install 
the 
air 
inlet assembly 
through 
floor 
opening.  Secure assembly 
to 
floor.  Slip 
flexible 
duct 
onto 
air 
inlet  assembly collar.  Secure 
flexible duct  to collar with 
a 
hose 
clamp. 
(Figure 
10). 
STEP 
I: 
A 
4-112" 
diameter opening 
will 
be 
required for 
installation 
of 
the air inlet assembfy.  Cut hole where 
no 
obstructions  are 
expected. 
STEP 
2: 
Slip the 
other 
end 
of 
the air duct  onto collar. 
protruding 
from 
the 
right side of 
the 
unit.  Secure 
duct 
Install  the 
air 
inlet  eyebrow  through 
wall 
opening. 
with 
screws 
or 
hose 
clamp. 
Secure eyebrow 
to 
exterior wall.  Push flexible duct 
onto 
eyebrow  collar until it secures 
into 
lances. 
(Figure 
9). 
AIR 
INLET 
- 
4" 
AIR 
DUCT 
FUPPUED 
BY 
CUSTOMER) 
STEP 
2: 
Slip 
the 
other end 
of 
the 
air 
duct 
onto 
collar, 
When 
the 
air 
duct 
is  connected 
to 
the  unit 
remove 
protruding 
from 
the 
right 
side 
of  the 
unit. 
Secure 
duct 
security bracket 
preventing 
outside 
air 
damper 
rcd 
to 
with screws or 
hose 
clamp. 
rotate, 
as 
shown 
in Figure 
11. 










