Installation manual
ROOF
JOIST
SHIELD
STEP
5:
After cutting the hole
in
the roof, uncover
the
STEP
8:
Place
flashing
into
position
on
unshingled
root.
pipe
and
add
sections
unlil
the chimney extends
a
Hold in
position
by
nailing
shingles
in
place
over
the
minimum
of
14
inches above
the
highest point
of
the
roof
flashing
edges.
cutout.
(Figure
27).
STEP
9:
Install storm collar
on
the
chimney
and
push
down
near the top of
the
Ilashing.
Apply
waterproof
caulking
around the
top
of
the
storm
collar.
(Figure
29).
STEP
6:
Slide
the
roof
joist shield over the outer
pipe.
It
must
be
positioned
to
cover
the
joist
at ail points
around
the
chimney pipe.
It
may
be
necessary to trim
the shield slightly to
match
the slope of the roof. Attach
the shield
to
the joists
using
the straps provided.
(See
Figure
27).
-
FIGURE
29
CAULK
STEP
7:
Position the flashing over the chimney and flat
on
the
roof.
Mark
an outline
of
the flashing
on
the
roof
and
remove
the flashing, Remove all nails within the
outlined area. (Figure
28).
7
FIGURE
28
0
STEP
10:
Install terminalion on
last
section of
pipe.
There are differenf terminafions approved
for
this
chim-
ney
system.
The
Round
Top Long is adjustable to
compensate for height variations.
The
Trim
Style
Top
is
designed to
be
used
on
a
chase
installation
of
decora-
tive chimney enclosure only. For
details,
consult
the
installation instructions of the termination being
used.
(See Figure
30).
FIGURE
30
1
NOTE:
You
may
wish
to
caulk
seam
notches
on all
joints
above
the flashing and
paint
all
exposed
parts of
the
chimney
with
galvanized primer paint.
A
coat
of
paint lo match the
house
may
then
be
applied.










