Specifications

M-Series Water Purification Machines
1238160 Rev. D 3 - 8 Preparation and Start-Up
19. The system is now operational.
20. Before putting the machine into final operation, continue to run the
permeate and concentrate streams to drain for at least 60 minutes. This is
done to ensure that all of the bactericide has been removed from the
sepralators.
21. Connect the permeate line to the point-of-use of the permeate. Check for
leaks and ensure that you have no you have no kinks in hoses, or
blockage of any plumbing on the permeate and concentrate outlet lines.
22. Make any final adjustments to flows and pressure according to Step 18, if
need be.
NOTE:
The element(s) in your machine are rated for certain flow rates at 77°F (25°C).
Maximum flow rates are achieved when the sepralators have been completely
rinsed and on-line for at least 24 hours.
23. A daily log sheet that includes general operating conditions (pressures,
flows, concentrations, pH, and pretreatment conditions), and routine or
special maintenance (flushing or cleaning as needed) must be kept. Mar
Cor Purification will require this log sheet if a warranty question arises.
WARNING:
IF UNIT IS TO BE USED IN A DIALYSIS SETTING, THE RO SYSTEM MUST
BE DISINFECTED PRIOR TO PATIENT USE.
CAUTION:
New units with new or replacement sepralators must be rinsed to drain under
normal pressure for a minimum of six (6) hours before first exposure to
formaldehyde or irreversible damage may occur.