Specifications
Figure 5–39 SA900 SDI Cable Connections
5. Route the power cords from the storage devices on the right side of the
cabinet down the right vertical I/O bulkhead.
6. Route the power cords from the storage devices on the left side of the cabinet
down the left vertical I/O bulkhead.
7. Connect the power cord to the power controller connector specified in
Figure 5–40.
Storage Array Add-Ons and Upgrades 5–61










