Installation guide
4.2 Single-Host Installation of an SF3xx Storage Array
Proceed once you have filled the cable and OCP labels according to the
instructions on the inside cover of the SF Family Label Booklet (part number
36–32882–01).
4.2.3.3 Placing the Labels (Single-Host)
Now that the labels have been filled out, place them on the DSSI cables and
the SF7x OCP doors. Also place a label on the front of the magazine tape
subsystem.
On the DSSI cable, place the label 2 inches behind the DSSI connector. See
Figure 4–6.
Figure 4–6 Placing a Label on a DSSI Cable
LABEL
SHR-X0108-90
Place the SF7x OCP label as shown in Figure 4–7 and the magazine tape
subsystem label as shown in Figure 4–8.
Installing an SF3xx Storage Array to a VAX 6000 System 4–11










