2.1 Unpacking and Placing the Storage Array
5. Make sure that the ac breaker is off.
6. Make sure that the bus switch of the power controller is in the ON (down)
position.
7. Check the ac power cords for each Sx7x enclosure and magazine tape
subsystem installed. Make sure that each is correctly seated.
8. Make sure that the voltage selection switches for each Sx7x storage
enclosure and magazine tape subsystem are in the correct position for the
power supplied by the installation site.
9. Make sure that all interface cables internal to the storage array are firmly
seated.
2.1.6 Repacking the DECArray300 Cabinet System
Use the following procedure to repackage the DECArray300 cabinet system:
1. Place the barrier laminate on top of the original cushioned shipping pallet,
matching front to front.
2. Using the original unloading ramps, push the cabinet onto the pallet,
placing the cabinet on top of the barrier laminate, matching the front of
cabinet with the front of the barrier laminate.
3. Place 10 bags of desiccant under the cabinet, between the barrier laminate
and the cabinet.
4. Secure the cabinet to the original cushioned shipping pallet using the
original cabinet hold-down brackets and bolts. Screw the bolts through the
holes of the barrier laminate and into the T-nuts in the original pallet deck.
5. Place the antistatic bag over the top of the cabinet.
6. Place the moisture barrier bag over the top of the cabinet.
7. Fold over the moisture barrier bag and barrier laminate, then seal the bag
using waterproof tape.
8. Repack the cabinet using the original carton, cover, and shipping material.
Please refer to the storage element’s user guide (for example, SF72/SA72) for
details of unpacking and repacking of the storage elements. For the SF72
storage elements and the TF857 tape loader magazine (see Chapter 5 and
Chapter 7).
2–8 Unpacking and Repacking a DECArray300 Storage Array