Installation guide
Magazine tape subsystem (cont’d)
labeling cables, 6–24
labels, filling out, 6–24
powering up, 6–23
troubleshooting, 8–11
unpacking, 6–3
where to install, 6–4
Magazine tape subsystem fault matrix, 8–13
MSCP switch, 4–3, D–4, D–14
O
OCP, removal and replacement, 3–10
P
Part number
DECArray300 variations, 1–1
Sx300 storage element, 2–9
Physical specifications, DECArray300, 1–6
Power connectors, 3–34
Power controller, 3–33, 7–2
Power cords, 3–33, 7–8
Power-up
disk ISEs
after Sx72–UK upgrade, B–5
magazine tape subsystem, 6–23
SF3xx storage array
single-host configuration, 4–12
SF7x storage enclosure, 5–43
Sx300 storage array
after dual-host conversion, C–16
Prefilter, 3–9
R
Ramp inspection, 2–3
Rear access panel
replacement, 3–11
Rear access panel, cabinet
removal and replacement, 3–11
Related documents, xvi
Repackaging
materials, 2–9
Repacking
DECArray300 cabinet system, 2–8
RF72 disk ISE
bringing on-line, B–8
installation into Sx72–HK storage
enclosure, B–2
Rx7x disk ISE
bringing on-line, 8–9
removal from SF7x storage enclosure,
8–4
S
S1 switches, 3–38
Safety precautions
disconnecting power source, 4–1, D–1
unloading storage array, 2–2
using ESD straps, 2–2
SDI/DSSI cables, internal, 3–33
SDI cables, internal, 7–8
SF1 first storage element to install, 3–4
SF300 storage array
DSSI cabling diagrams, A–1
SF3xx storage array
cabling
dual-host configuration, 4–17
single-host configuration, 4–7
dual-host configurations, 4–2
final verification
of single-host configuration, 4–15
inspection
dual-host configuration, 4–16
single-host configuration, 4–3
installation of, 4–1
dual-host configuration, 4–16
single-host configuration, 4–2
labeling
dual-host configuration, 4–18
single-host configuration, 4–9
powering up
single-host configuration, 4–12
single-host configurations, 4–2
SF7x storage enclosure
cabling
for dual-host configuration, 5–29
Index–4










