Installation guide

DECarray
final verification (cont’d)
of DSSI VAXcluster configuration,
D–22
of single-system configuration, D–12
inspection
DSSI VAXcluster configuration, D–14
single-system configuration, D–4
installation of, D–1
DSSI VAXcluster configuration, D–12
single-system configuration, D–2
installation of, with VAX 4000, D–1
single-system configuration, D–2
DECArray300 cabinet system, description,
1–1
DECArray300 shipping container contents,
2–1
DECArray300 storage array
doors, how to open, 2–5
inspection, 2–5
leveling, 2–3, 2–4
placement of, 2–4
unloading procedures, 2–2
Door on DECArray300, removal of
rear, 2–5
DSSI bus meter, 8–4
DSSI ID
switch settings
SF7x, 5–12
verification of
for DSSI VAXcluster configuration,
D–14
for single-host configuration, 4–3
for single-system configuration, D–4
DSSI signal integrity, 1–11
DSSI terminators
illustration of
for DSSI VAXcluster configuration,
D–17
for dual-host configuration, 4–18
for single-host configuration, 4–8
for single-system configuration, D–7
installation of
for single-host configuration, 4–9
for single-system configuration, D–7
DSSI terminators (cont’d)
placement of
for single-system configuration, D–7
DSSI VAXcluster configuration
description of, D–12
Dual Host Cabling rules, A–2
Dual-host configuration
See also Converting to dual-host
configuration
cabling a magazine tape subsystem for,
6–20
cabling an SF7x for, 5–29
converting to, C–1
description of, 4–2
E
Electrical specifications (120/240 Vac),
DECArray300, 1–7
Electrostatic discharge, 3–7, 7–8
EMC finger strips on SA7x, 3–6
EMI/EMC, 1–11
Environmental operating range, 1–8
ESD, electrostatic discharge, 2–2
F
FCC approval, 1–11
Front panel J10, J11, 3–39
G
Grille (bezel) mounting brackets, 3–14
H
Half bezel mounting, 3–10
Hardware installation procedures
magazine tape subsystem, 6–9
SF7x storage enclosure, 5–11
Index–2