Installation guide

7.3 Add-On of SDI Disk Drive Installation
connect the SDI cable connectors to the Port A and Port B connections on
the rear of the disk drive. The power cords for the 110/120 VAC versions of
the cabinet are the only once installed for all 6 storage enclosure slots.
Note
There are two I/O panels mounted in the rear of the cabinet. For SDI
cables start mounting on the right panel. Mount the cables of the first
SDI storage device on the bottom connectors of the right panel. The
second one in the middle and the third one on top of the right panel.
Depending of the storage elements mounted an DSSI/SDI panel might
be mounted as left panel or a SDI panel with the possibility to connect
additional three storage enclosures.
For RA9X Storage devices use the LF connector slots.
2. Connect each power cord to the ac power input on the rear of the storage
element, near the circuit breaker. See Figure 7–3.
3. Before applying power to the cabinet, turn to (Section 3.19) for information
about the power controller switches, disk drive voltage selector switch, and
the circuit breaker.
7–10 Installation and Preparation of the Add-On SDI Storage Elements