Installation guide

6.1 Steps to Install
g. Check that this and all other operator control panel (OCP) and
magazine tape subsystem fronts project through the front storage
array correctly. If not, adjust the height with shims. Place the half
bezel and the side strips in position.
CAUTION
Do not power up the enclosure at this time.
6–12 Installing the Magazine Tape Subsystem in an Sx300 Storage Array