Installation guide
5.2 Cabling the SF7x in Storage Array Position
Figure 5–15 Installing the 70- and 108-Inch DSSI Cables for Position 2
SHR-X0122-90
70 INCH
DSSI CABLE
108 INCH
DSSI CABLE
sx300
I/O PANEL
c. From port 8 on the Sx300 I/O panel, connect the 108-inch DSSI cable to
the right DSSI connector (RED) of the second system I/O panel.
CAUTION
Do not apply power to the SF7x enclosure at this time.
The following steps are for cabling SF2 with a magazine tape subsystem TF2:
CAUTION
Use care not to disturb or damage power cords and DSSI cables that
are already connected to the DSSI I/O panel.
5–34 Installing the SF7x Storage Enclosure in an Sx300 Storage Array










