Installation guide
4.3 Dual-Host Installation of an SF3xx Storage Array
You can also refer to the inside cover of the SF Family Label Booklet
(part number 36–32882–01) for instructions on how to fill out these
labels.
4.3.3.2 Filling Out the Labels (Dual-Host)
There are two sizes of labels: the larger one for the DSSI cables, and the
smaller one for the inside of the SF7x OCP door and the system I/O panel.
Refer to the inside cover of the SF Family Label Booklet (part number 36–
32882–01) for the instructions on what information to put on each of the two
types of labels.
For the dual-host configuration, Table 4–3 lists the colored labels to be used on
the SF7x OCP door, the front panel of the magazine tape subsystem, and all
DSSI cables.
Table 4–3 Dual-Host Colored Labels for the SF72 OCP Door
Label Color Port/Position
Blue Port 1, SF1 and TF1, port 7
Red Port 2, SF2 and TF2, port 8
Yellow Port 3, SF3 and TF3, port 9
Green Port 4, SF4 and TF4, port 10
Blue with white strip Port 5, SF5, port 11
Red with white strip Port 6, SF6, port 12
Proceed once you have filled the cable and OCP labels according to the
instructions on the inside cover of the SF Family Label Booklet (part number
36–32882–01).
4.3.3.3 Placing the Labels (Dual-Host)
Now that the labels have all been filled out, place the labels on the DSSI cables
and the SF7x OCP doors. Also place a label on the front of the magazine tape
subsystem.
On the DSSI cable, place the label 2 inches behind the DSSI connector as
shown in Figure 4–12.
4–20 Installing an SF3xx Storage Array to a VAX 6000 System










