Owner`s manual

25700-1-0809Page 30
PVCTCOLINEARTRANSITIONVENTKIT
Available from Empire Comfort Systems, Inc.
Flat Roof or Chimney Application
1. Attach plate to chimney chase or at roof with four (4) screws. Use outdoor sealant to seal transition plate to the roof or chimney
chase.
2. Check local codes to determine air intake height from roof. The minimum height for this application is 12”.
3. Cut 1 1/2” PVC pipe to correct height. Attach pipe, PTrap, and exhaust cap to plate. Glue all joints with PVC cement.
AIR INTAKE
PTRAP OR290° ELBOWS
SUPPLIED BY INSTALLER
TRANSITION PLATE
PVC CEMENT
PVC CEMENT
OUTDOOR SEALER REQUIRED
OPTIONAL CAP
MODEL PVVTC
ORDER SEPARATE
EXHAUST
3” MIN.
HEIGHT (MIN.12”)
HorizontalApplication
1. Attach plate to outside wall with four (4) screws. Use outdoor sealant to seal transition plate to the wall.
2. Cut 1 1/2” PVC pipe to correct length. The minimum length for this application is 9” for the exhaust and 6” for the air intake. Glue
all joints with PVC cement.
Figure 42 - Colinear Transition Plate
AIR INTAKE
PTRAP OR290° ELBOWS
SUPPLIED BY INSTALLER
TRANSITION PLATE
PVC CEMENT
PVC CEMENT
OUTDOOR SEALER REQUIRED
3” MIN.
HEIGHT (MIN.12”)
EXHAUST
PTRAP OR 2 90° ELBOWS
SUPPLIED BY INSTALLER
Note: Must maintain a minimum 3” between
exhaust outlet and air intake.
Note: Exhaust must be a minimum of 3” above air intake inlet.
Figure 43
Figure 44
Figure 45
Figure46
10 x 1 1/2” Hex Head Screw