Owners manual
Minimum Height
from STEP 9
Align the Wall Plate {32} to two studs above the mantle
and position the height using the table in STEP 9. Level
the Wall Plate. The Wall Plate might not be centered.
Mark the center line of the mantel onto the Wall Plate.
Mark the 4 spots for lag bolts directly onto the centers of
the studs.
12
Pre-drill the 4 holes with 7/32” drill bit to a depth of
2.5 inches (65mm) including wall covering. Note: Wall
covering (drywall) must not exceed 5/8” thickness.
13
14
Attach the Wall Plate {32} using Lag Bolts {17} and
Washers {11} directly into the centers of the studs.
15
!
CAUTION:
Do Not overtighten Lag Bolts {17}. Tighten only until the
washers are firmly against the wall plate. Damage due to
overtightening can cause property damage or injury.
Align the center of the Lifting Mechanism {35} to the
center mark on the Wall Plate {32}. Install 4 Bolts {14}
through the back channels of the Wall Plate into the
threaded holes of the Mechanism. Tighten Securely.
DO NOT
damage or scratch
the rods of the
Gas Springs!
C
L
C
L
PAGE 8 MantelMount MM340