Service Manual

Table Of Contents
Part Number 8014793 6/18 159
Self-Contained Recovery/Evacuation
1. Place the toggle switch in the OFF position.
2. Install manifold gauge set, scale and recovery unit
or two-stage vacuum pump.
3. Open (backseat) the high and low side ice
machine service valves if required, and open high
and low side on manifold gauge set.
4. Perform recovery or evacuation:
A. Recovery: Operate the recovery unit as
directed by the manufacturer’s instructions.
B. Evacuation prior to recharging: Pull the
system down to 500 microns. Then, allow the
pump to run for an additional half hour. Turn
off the pump and perform a standing vacuum
leak check.
5. Follow the Charging Procedures.
MANIFOLD SET
OPEN
BACKSEATED
VACUUM PUMP/
RECOVERY UNIT
CLOSED
OPEN
LOW SIDE
SERVICE
VALVE
HIGH SIDE
SERVICE
VALVE
BACKSEATED
OPEN
RECOVERY/EVACUATION
CONNECTIONS