Troubleshooting guide
8
Installation and Service Manual
Post mix system:
CO
2
regulator set
Beverage dispenser
Beverage tubing
CO
2
tank
Carbonator
Stepless (Oetiker) clamps
Chain for CO
2
tank
B-I-B System also:
B-I-B connectors
B-I-B regulator set
B-I-B rack
B-I-B syrup boxes
Also consider the location of the following items before
installation:
Water line
Drain
Power outlet
Heating and air conditioning ducts
Before you begin the installation, please check to be sure you can achieve a proper installation. Things to look for
include, but are not limited to:
If being installed in a counter, be sure you have
a flat, level counter top.
Is there enough space for the LP-3? You will
need to have at least a 36” deep countertop to
do a proper installation.
How about under the counter? Is there room for
the LP-3 with drain underneath and beverage
tubing coming from the rear of the unit along
with the electricity necessary? It is suggested
that you have at least 18” of open space to the
right and left of the unit for an easy installation.
If being installed in a counter are there any
braces or support structures in the counter top
that could be cut and damaged?
Avoid direct sunlight or close heating / air con-
ditioning ducts.
Is a proper drain available? The LP-3 has four
3/4" drains and two 1/4" purge drain.
If installed in a cabinet the side, rear, and front
panels should be left off for service ability.
INSTALLATION
PRE-INSTALLATION CHECK LIST
When installing any system, first make sure the major components are available. Generally the major components
necessary for an installation are: