Specifications
Maintenance Section 4
4-2  Part Number 000001759
B. Remove the ice thickness probe
• Compress the hinge pin on the top of the ice 
thickness probe.
Ice Thickness Probe Removal
• Pivot the ice thickness probe to disengage one pin 
then the other. The ice thickness probe can be 
cleaned and sanitized at this point without complete 
removal. If complete removal is desired, disconnect 
the ice thickness control wiring from the control 
board.
C. Remove the water distribution tube
• Disconnect the water hose from the distribution tube.
Water Distribution Tube Removal
• Loosen the two thumbscrews which secure the 
distribution tube.
• Lift the right side of the distribution tube up off the 
locating pin, then slide it back and to the right.
Disassemble for cleaning/sanitizing.
• Twist both of the inner tube ends until the tabs line up 
with the keyways.
• Pull the inner tube ends outward.
Water Distribution Tube Disassembly
SV3135
COMPRESS 
HINGE PIN TO 
REMOVE
!
Caution
Do not force this removal. Be sure the locating pin is 
clear of the hole before sliding the distribution tube 
out.
SV1620
1. LIFT UP
2. SLIDE BACK
3. SLIDE TO RIGHT
DISTRIBUTION 
TUBE
THUMBSCREW
THUMBSCREW
LOCATING 
PIN
3
2
1
SV1211
INNER TUBE
TAB
KEYWAY
INNER TUBE










