Specifications
Installation Instructions Section 2
2-14 Part Number 000001759
Installation Check List
Is the Ice Machine level?
Has all of the internal packing been removed?
Have all of the electrical and water connections 
been made?
Has the supply voltage been tested and checked 
against the rating on the nameplate?
Is there proper clearance around the ice machine 
for air circulation?
Has the ice machine been installed where 
ambient temperatures will remain in the range of 
1.7° - 43°C?
Has the ice machine been installed where the 
incoming water temperature will remain in the 
range of 0.6° - 32°C?
Is the water trough drain plug installed?
Are the ice machine and bin drains vented?
Are all electrical leads free from contact with 
refrigeration lines and moving equipment?
Has the owner/operator been instructed 
regarding maintenance and the use of 
Manitowoc Cleaner and Sanitizer?
Has the owner/operator completed the warranty 
registration card?
Has the ice machine and bin been sanitized?
Is the toggle switch set to ice? (The toggle switch 
is located directly behind the front panel).
Is the ice thickness control set correctly? (Refer 
to Operational Checks in Section 3 of this manual 
to check/set the correct ice bridge thickness).
Additional Checks for Remote Models
Has the receiver service valve been opened 
100%?
Does the remote condenser fan operate properly 
after start-up?
Has the remote condenser been located where 
ambient temperatures will remain in the range of 
-6.6 - 49°C?
Is the line set routed properly?










